What is a method statement example?

What is a method statement example?

For example, a plan could show the location of a hazard or where welfare facilities are. You might get asked for a method statement with a risk assessment, and clients will often ask for a copy of your ‘RAMS’, which means risk assessments and method statements.

How do you make a method statement?

Your method statement should include a few important items, such as:

  1. The project.
  2. The activity.
  3. Date of assessment.
  4. Assessor.
  5. Responsibilities.
  6. Hazards (or reference to relevant risk assessment)
  7. Work procedure and control measures. Sequence of work. Access provisions. Security and safety of others. Techniques.
  8. PPE requirements.

What is a method statement template?

A method statement is a type of health and safety document that people usually use for high-risk work. The document should identify the potential hazards that may arise during a particular task and outline the necessary precautions that must be put in place and taken by workers.

Are method statements a legal requirement?

While not required by law, method statements are also prepared for many other construction activities and are proven to be an effective and practical way to help plan, manage and monitor construction work.

Who can write method statements?

Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor. The HSE suggests that those preparing method statements should consider: Is there a safer way of doing this task?

What should be included within a method statement?

A method statement should also include:

  • Name of the company.
  • Start and completion dates.
  • Location of where the task will be carried out, including address.
  • Site contact details, including Site Supervisor and who to contact in case of emergency.
  • Name of person who completed the method statement.

Who provides a method statement?

Method statements should be written by a competent person who is familiar with the process being described and may need to be agreed between the client, principal contractor and contractor.

Who completes work method statements?

A work method statement is prepared for each task on a particular worksite, the group of work method statements are then packaged and is typically submitted at the beginning of a project for approval by the client or their representative.

Who writes a method statement?

Who needs a method statement?

Once you carry out a risk assessment, you should create a method statement using the information outlined in the risk assessment about potential hazards and the risks they pose. The documents also need to be reviewed and rewritten whenever tasks are carried out in a new location or using new equipment.

How to write method statement for painting works?

Method Statement for Painting Works 1 Title 2 Purpose and scope. The purpose of this method is to describe the measures and ways of proper application of paint at control tower. 3 Work procedure. Mock up sample would be made for selection and approval of the Engineer prior to commencement of the works. 4 Safety. 5 Equipments and tools.

Can you edit the painting safe work statement?

Preview this smarter painting SWMS below. Open the work method statement entry and try edit the template. Use and modify this painting safe work method statement for free. Access, read and sign off on your painting SWMS from anywhere at any time using any mobile, tablet or computer.

How are mock samples prepared for interior painting?

Mock Samples will be prepared in the designated area for the CONSULTANT approval using the correct material, number of coats, colour, texture and degree of gloss required. The Surfaces to receive painting shall be free from all loose particles and prepared as per manufacturer’s recommendation.

What is the pre start meeting for painting works?

Operatives will be inductive before working at site. Pre-start meeting would be conducted before the start of painting activities and tool box meeting would be regularly conducted by safety officer for all concern operatives. Inspection Request to be submitted for checking and approval of the Engineer. 4. Safety